Jump to content

Four More Gates Have Arrived


BillB48
 Share

Recommended Posts

Four more gates that were built in Italy, bringing the total to 12 now in Panama, have just arrived on the Atlantic side. The link takes you to a 2 minute video...

 

 

Only 4 more gates remain to be delivered to complete the 16 gates that are needed for the Expansion project. Something else I think is interesting, the two vessels that have been used to transport the new gates from Italy are "post-Panamax" ships that are too wide for the present Locks. I have not heard as to how or when the new gates for the Pacific side will be transported.

Link to comment
Share on other sites

In preparation for the arrival of the next four gates the Canal quietly slipped another of the already delivered gates into the upper level of the Atlantic Locks. This brings a total of 5 gates that have been placed for in the lock complex awaiting their final installation. It appears that it was transported to this position on Sept. 4.

 

jrag3k.jpg

 

A little closer view...

 

2q1ypv7.jpg

Link to comment
Share on other sites

  • 5 weeks later...

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
 Share

  • Forum Jump
    • Categories
      • Welcome to Cruise Critic
      • New Cruisers
      • Cruise Lines “A – O”
      • Cruise Lines “P – Z”
      • River Cruising
      • ROLL CALLS
      • Cruise Critic News & Features
      • Digital Photography & Cruise Technology
      • Special Interest Cruising
      • Cruise Discussion Topics
      • UK Cruising
      • Australia & New Zealand Cruisers
      • Canadian Cruisers
      • North American Homeports
      • Ports of Call
      • Cruise Conversations
×
×
  • Create New...