Hi,
Sounds good that repairs are being done '' on site'' in Seward, meaning no drydock needed.However, one hopes repairs will be COMPLETED soon enough to allow Radiance to sail deadhead to Vancouver in time for 8th september sailing. IMO , minimum 80 + / - hrs is needed for her to hit the open Pacific ocean , deliver the best V-Max left in her ( she is 23 years old after all...) , zip right to Vancouver and be docked by latest 1100hr/08sep in order to operate the 8th sept sailing. As of this writing, she is still docked in Seward.....Fingers crossed.
cheers