donaldsc Posted June 1, 2023 #1 Share Posted June 1, 2023 https://fm.kuac.org/local-news/2023-05-30/pretty-rocks-bridge-project-to-get-underway-this-summer DON 1 Link to comment Share on other sites More sharing options...
Northern Aurora Posted June 1, 2023 #2 Share Posted June 1, 2023 Don: This was reported several weeks ago (possibly a month?) on CC. Tonight's Alaska News Nightly radio program was interesting -- apparently the company which was awarded the contract had planned to build their construction camp in May and now won't even build their camp for their workers until July. They are planning to construct a 50 worker camp at mile 27 (a gravel pit). And more clay soils have been discovered on the west side of the project. I am starting to wonder when this project will be completed. The single park road beyond the Pretty Rocks area has had no maintenance since the road was closed at Pretty Rocks in 2021. After several years of no maintenance one can only speculate about the condition. 3 Link to comment Share on other sites More sharing options...
Sigyn Posted June 1, 2023 #3 Share Posted June 1, 2023 Thanks for posting, Don. I hadn't heard this. I'm waiting until the road is repaired before taking my husband to Denali. I saw it 20+ years ago, to the end of the road, and I think it's definitely worth waiting on the full experience. Link to comment Share on other sites More sharing options...
geepmaley Posted June 1, 2023 #4 Share Posted June 1, 2023 We are going in September as part of a land tour with Princess. I realize the road will be closed, but what are must do/see things with current restrictions? Link to comment Share on other sites More sharing options...
AKStafford Posted June 1, 2023 #5 Share Posted June 1, 2023 1 hour ago, geepmaley said: We are going in September as part of a land tour with Princess. I realize the road will be closed, but what are must do/see things with current restrictions? The road is still open to Mile 43. Link to comment Share on other sites More sharing options...
donaldsc Posted June 1, 2023 Author #6 Share Posted June 1, 2023 13 hours ago, Northern Aurora said: Don: This was reported several weeks ago (possibly a month?) on CC. Tonight's Alaska News Nightly radio program was interesting -- apparently the company which was awarded the contract had planned to build their construction camp in May and now won't even build their camp for their workers until July. They are planning to construct a 50 worker camp at mile 27 (a gravel pit). And more clay soils have been discovered on the west side of the project. I am starting to wonder when this project will be completed. The single park road beyond the Pretty Rocks area has had no maintenance since the road was closed at Pretty Rocks in 2021. After several years of no maintenance one can only speculate about the condition. Assuming that they really get the construction camp finished by July which is probably unlikely, how many months would they have to work before they have to shut down for the winter. When they do get it finished and then get the road after Pretty Rocks back in shape there is the Eielson Visitor center and the lodge at the end of the road that will need fix up since I am sure that both have them have have had minimal if any maintenance since the road was closed. If I was a betting man as I must be since I live in Las Vegas I would pick some time in 2030 as when everything is completely done and restored. Perhaps we should start a CC pool where we pick the date for complete reopening of the full road and all the infrastructure. The problem is what sort of a prize can we offer for the winner - a lifetime free membership in CC. DON Link to comment Share on other sites More sharing options...
Northern Aurora Posted June 1, 2023 #7 Share Posted June 1, 2023 I just checked another article about the situation. According to Dan Bross (reporter for our NPR station KUAC) work is scheduled to start in July so possibly the camp for the construction workers will be done by then. It is a 50 employee camp so I suspect we are talking about pre-fab ATCO units. Bross's reporting indicates that thermosiphons will be installed. Originally it was thought that 30 thousand cubic yards of clay would be removed, but now it appears that 80 thousand cubic yards will need to be removed. I have no idea how long they will be able to work. I do know that there is a minimum temperature for applying road paving. Does anyone know if there is a minimum temperature for working with concrete? @wolfie11 had suggested a CC pool be started in one of her posts several months ago. At that time the NPS was still projecting a 2025 completion date. The NPS website has quietly updated a completion date of 2026 on their website. Even though our local Fairbanks newspaper has a full time reporter in the Denali area we are hearing/reading very little about the issue. Link to comment Share on other sites More sharing options...
AKStafford Posted June 1, 2023 #8 Share Posted June 1, 2023 I've got a friend working construction on the Dalton Highway. He was told to plan on working until late October. Of course they probably don't get the snow that Denali does... 1 Link to comment Share on other sites More sharing options...